    Construction, installation, configuration works
    2010
    1. General Contract of the reconstruction and expansion of SG 330/110 kV at Ladyzhyns'ka CHP station with installation of SF6-gas breaker LTB - 420 produced by ABB for the request of OJSC "MHP"
    2. Installation and configuration works of AT-2 protections reconstruction at S/S-330 kV "Oktyabrskaya" Central ES NEC Ukrenergo
    3. General contract for construction, installation, configuration works of the installation of power transformers 2õ16MBA 110/35/6kV and con-struction of two new cells 110 kV at ES-110kV 110kV "Zdolbuniv" OJSC Rivneenergo..
    magnify picture magnify picture

    2009
    4. General contract for installation, configuration works of microprocessor protection L-60, GE, REL-670, REB-670 produced by ABB, equipment supply for the protection of 220 kV lines at Burshtyns'ka CHP station – S/S 220/330 kV "Mukachevo "
    5. General contract for installation, configuration works of microprocessor protections GE L-60, ABB REL-670 equipment supply for the protection of 220 kV lines at Burshtyns'ka CHP station – S/S 220kV "Stry"

    6. General contract for installation, configuration works of microprocessor protections "Diamond", equipment supply for OV-110kV protection at S/S-330 kV "Vinnitsa", S/S-330 kV " Kamyanets - Podolsky "
    7. Installation and configuration works of 110kV breaker replacement (pro-duced by Siemens) with protections reconstruction using microproces-sor devices MRSA (6 units) at S/S OJSC "Khmelnitskoblenergo "
    8.General contract for installation, configuration works of microprocessor protections L-60, GE, REL-670, REB-670 produced by ABB, 7VK, 7VA produced by Siemens, «FOL", "ALAR", "Diamond", equipment supply for the protections of 330 kV lines at Ladyzhynska CHP station - No-vodnestrovska PSP Ladyzhynska CHP station – S/S 330 kV "Ivano-Frankivsk". Installation and configuration works of implementing HF communications and robot devices.
    9.General contract for installation, configuration works of reconstruction of RZ and PA VRP at Burshtyns'ka CHP station and HF-processing at 330 kV Burshtyns'ka CHP station – S/S 330 kV "Ivano-Frankivsk"
    10. General contract for construction S/S 110/6kV GIS type (produced by ABB) at OJSC "Podolsk cement" (equipment supply, construction, in-stallation, configuration of transformers 110 / 6 kV 16 000 kVA, 110 kV GIS, SB 6kV, transformers and auxiliary shield of their own needs, con-trol power cabinets, installation of KL 110 kW, manufacture, installation, configuration of control panels, automation and security GIS 110 kW).

    2008
    11. Configuration works of aircraft equipment launching (type 110/35/6kV GIS JSC "Volyn Cement", Zdolbuniv.

    12. General Contract for construction TP110/6kV GIS type (produced by ABB) at OJSC " Ivano-Frankivsk" (equipment supply, construction, in-stallation, configuration of transformers 110 / 6 kV 16 000 kVA, 110 kV GIS, SB 6kV, transformers and auxiliary shield of their own needs, con-trol power cabinets, installation of KL 110 kV, manufacture, installation, configuration of control panels, automation and security).

    13. General Contract for reconstruction and expansion of S/S 110 kV "Oporna" OJSC "Prikarpattyaoblenergo" (reconstruction of cell 110kV with equipment supply, installation and configuration of SF6-gas 110 kV breaker, current voltage transformers 110kV, 110kV disconnectors (produced by ABB), construction of a new cell 110 kV with equipment supply, installation and configuration of 110 kV SF6-gas breaker, 110 kV current voltage transformers, manufacture, installation, configuration of control panels, automation and protection equipment 110kV.

    2007
    14. Installation, configuration of four SF6-gas breakers 110 kV, one 35kV at S/S OJSC "Krymenergo".
    15. General Contract of reconstruction of S/S 35/6kV DVHP "Polimineral" (project works of secondary commutation circles, civil works, installation and configuration of the replacement of three blocks SF6-gas breakers 35kV, 6kV vacuum breakers, manufacturing of automation panels and protect switches 35kV, installation and configuration of secondary commutation circles, lines portals 35kV replacement ).

    16. Installation and configuration works at S/S 35 / 0,4 kV JSC "Morshinsky mineral water plant "Oscar", (installation and adjustment of SG 35kV, installation of power transformer 35 / 0,4 kV, installation and adjustment of SG 0,4 kW and auxiliary cabinets , power cables and control lines installation).

    17. Installation and configuration of CC "Lvivvodokanal", (installation and adjustment of SG 6 and 0,4 kV)
    18. Installation and configuration works at OJSC "Lanivska Poultry", Stryisky district (installation and configuration of SG 6 and 0.4 kV, power transformers 10 / 0,4 kV.)
    19. Installation and configuration works at JSC "Kyivoblenergo", S/S 110/35/10kV "Boryspil", (full complex of works - replacement of two units of 110 kV breakers for SF6-gas breakers, replacement of three blocks of 35kV breakers for vacuum breakers, relay protection reconstruction with microprocessors replacement)
    20.Installation and configuration of two 150 kV SF6-gas breakers at S/S-150kV OJSC EC "Mykolaivoblenergo".
    21. Production, installation and configuration of the central alarm panel, at S/S-330 kV "Vinnitsa " and " Kamyanets Podilsky" PZES NEC "Ukren-ergo"
    22. Installation works for implementation of the second block at Tashlytska HAES.

    23.Manufacturing, installation and configuration of 330 kV lines protections at S/S-330 "Chernivtsi" PZES NEC "Ukrenergo"
    2006
    24. Configuration of SG-330 kV panel with differential lines protection on devices 7SD522, REL561; panel with protection 7SA522, UT633, panel with automatic protection devices such as "Diamond" at Tashlytska HAES ;

    25. Delivery, installation and configuration of the differential tire protection produced by ZprAE (Poland) at S/S-220 kV "Stry" Western ES "Ukrener-go" for 12 connections. (trails development, construction of secondary cables over 6 km., boxes installation, panels).
    26. Relay protection panels and control autotransformer 330 kV production at S/S "Hrabiv" Western ES NEC "Ukrenergo".
    27. Relay protection panels and control autotransformer 220 kV production at S/S "Stry" Western ES NEC "Ukrenergo".
    28. General Contract for construction of S/S - 110/6kV OJSC "Iskra", Lviv
    29. Secondary switching circuits installation at S/S-110/10 kV "HEKRO" (over 7 km), control of relay protection on microprocessor devices like "Diamond" and MRZS and comprehensive of checking registration sys-tem "Regina", configuration works etc..

    30. Configuration works at S/S-110 kV "Broshniv" OJSC "Prikarpattyaob-lenergo"(with lines protection panels type REL-511, transformer pro-tection type RET-521
    31. Configuration works of AL-750 kV protections at "HAES - Westernu-krainian" (panel with devices REL-531, PDE 2003.1 with hold subsystem PVZ, 7SA513, 7VK512, 7SV512);
    32. Configuration works of protections I tires system at S/S-750 kV "Wes-ternukrainian" (panel with device type 7SS601, panel with device RED521)
    33. Configuration of panels ALAR at two AL-220 kV "Dobrotvirska" CHP station - Western" at both ends
    34. Configuration works RZA at AL-154 "Kaborha-Tryhaty" (panel with de-vice 7SA611)
    35. Regular and preventive works with checking 110 kV line with devices REL-511 at GC "Lokachi" in full
    36. Configuration works at S/S 35 / 6 kV "Ozymyno" OJSC "Oil plant-Galichina", Drogobych
    37. Installation, configuration works at S/S-8 S/S-14, CS/S - 6kV (total number of SB VM-1 type 6kV, 62 pcs.) OJSC "Oil plant-Galichina", Drogobych.